Gas Installations & Services

NATURAL GAS INSTALLATION

THE 1-2 PUNCH

PHASE ONE

On site Survey and Consultation with Gas Master Tech to determine needs
You will be provided with one or more quotes/options for your project
You Accept the Quote of choice by signing and providing the Deposit for us to begin process
We receive Deposit and plan the scope of work – Go to the City and pull permits for the job
Permits are placed on site for work to begin.

 

PHASE TWO

If Trenching or directional Boring is necessary utilities will be alerted and work is pending clearance
Work begins by Trenching if necessary in your particular job
Poly pipe is laid in the Trench or Galvanized piping is attached to the wall
Valves, Regulators are Installed as necessary in your particular project
Rough Inspection is called in and Pressure Test is performed
The Trench is covered after rough inspection is passed
All final connections are made and Final Inspection is called to complete the project.

SIMPLE… AND YOU’VE GOT GAS!

NOW  “MR. GREEN”   WILL STAY AT HOME A LITTLE MORE …